{"id":3899,"date":"2024-05-06T15:17:43","date_gmt":"2024-05-06T18:17:43","guid":{"rendered":"https:\/\/guialimeira.com.br\/2024\/05\/06\/programacao-de-obras-e-zeladoria-06-05-portal-do-municipio-de-piracicaba\/"},"modified":"2024-05-06T15:17:43","modified_gmt":"2024-05-06T18:17:43","slug":"programacao-de-obras-e-zeladoria-06-05-portal-do-municipio-de-piracicaba","status":"publish","type":"post","link":"https:\/\/guialimeira.com.br\/news\/programacao-de-obras-e-zeladoria-06-05-portal-do-municipio-de-piracicaba\/","title":{"rendered":"Programa\u00e7\u00e3o de Obras e Zeladoria \u2013 06\/05 \u2013 Portal do Munic\u00edpio de Piracicaba"},"content":{"rendered":"<p> <br \/>\n<\/p>\n<div itemprop=\"articleBody\">\n<div class=\"m-auto col-lg-8\">\n<figure class=\"text-center\">\n<img data-recalc-dims=\"1\" width=\"348\" height=\"288\" src=\"https:\/\/i0.wp.com\/piracicaba.sp.gov.br\/wp-content\/uploads\/2024\/03\/OBRAS-SITE.jpg?resize=348%2C288&#038;ssl=1\" class=\"img-fluid img-thumbnail border-1 wp-post-image\" alt=\"\" itemprop=\"image\" decoding=\"async\" fetchpriority=\"high\" srcset=\"https:\/\/piracicaba.sp.gov.br\/wp-content\/uploads\/2024\/03\/OBRAS-SITE.jpg 348w, https:\/\/piracicaba.sp.gov.br\/wp-content\/uploads\/2024\/03\/OBRAS-SITE-300x248.jpg 300w\" sizes=\"(max-width: 348px) 100vw, 348px\"\/><\/figure>\n<p>A Secretaria Municipal de Obras e Zeladoria (Semozel), atende hoje, 06\/05, 13 bairros.<\/p>\n<p>O time de tapa-buracos trabalha nos seguintes locais: avenida Branca de Azevedo, rua Caramuru, rua Pedro Paulo dos Santos, rua Jos\u00e9 Riolando Theodoro, rua Territ\u00f3rio do Acre e rua Jos\u00e9 de Andrade Franco.<\/p>\n<p>A equipe de \u00e1guas pluviais trabalha com reparos de galeria na rua Caramuru, no Castelinho.<\/p>\n<p>O time de boca de lobo executa manuten\u00e7\u00e3o de boca de lobo no Engenho Central.<\/p>\n<p>A equipe de guias e sarjetas executa guia e reparos de sarjeta na rua Honorato Faustino, no bairro Jardim Ibirapuera.<\/p>\n<p>O time de el\u00e9trica est\u00e1 trabalhando com manuten\u00e7\u00e3o no Engenho Central, com montagem de evento no Centro C\u00edvico e com desmontagem de evento no Parque 1\u00ba de Maio.<\/p>\n<p>As equipes que trabalham com m\u00e1quinas e equipamentos est\u00e3o atuando com melhorias com m\u00e1quina e aplica\u00e7\u00e3o de material em ruas do bairro Santana.<\/p>\n<p>O time de obras civis est\u00e1 executando reparos em piso do Engenho Central e reparos de cal\u00e7ada na avenida Thales Castanho de Andrade.<\/p>\n<p>As equipes de pra\u00e7as, parques e centros de lazer executam instala\u00e7\u00e3o de estruturas em recintos no Zool\u00f3gico Municipal, reconstru\u00e7\u00e3o de caixas de passagem el\u00e9trica na pista de caminhada do M\u00e1rio Dedini, manuten\u00e7\u00e3o de sanit\u00e1rios na Rua do Porto, manuten\u00e7\u00e3o de academia e playground no Centro de Lazer do Jardim Borghesi.<\/p>\n<p>Programa\u00e7\u00e3o sujeita a altera\u00e7\u00e3o.<\/p>\n<\/div>\n<\/div>\n<p><br \/>\n<br \/><a href=\"https:\/\/piracicaba.sp.gov.br\/noticias\/programacao-de-obras-e-zeladoria-06-05\/\" rel=\"noopener\">Informa\u00e7\u00f5es PMP <\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>A Secretaria Municipal de Obras e Zeladoria (Semozel), atende hoje, 06\/05, 13 bairros. O time de tapa-buracos trabalha nos seguintes locais: avenida Branca de Azevedo, rua Caramuru, rua Pedro Paulo dos Santos, rua Jos\u00e9 Riolando Theodoro, rua Territ\u00f3rio do Acre e rua Jos\u00e9 de Andrade Franco. A equipe de \u00e1guas pluviais trabalha com reparos de [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":2039,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_mbp_banners":[],"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2},"jetpack_post_was_ever_published":false},"categories":[20],"tags":[],"class_list":["post-3899","post","type-post","status-publish","format-standard","has-post-thumbnail","category-regiao"],"jetpack_publicize_connections":[],"jetpack-related-posts":[],"jetpack_shortlink":"https:\/\/wp.me\/p7Eq1F-10T","jetpack_sharing_enabled":true,"jetpack_featured_media_url":"https:\/\/i0.wp.com\/guialimeira.com.br\/news\/wp-content\/uploads\/2024\/04\/OBRAS-SITE.jpg?fit=348%2C288&ssl=1","_links":{"self":[{"href":"https:\/\/guialimeira.com.br\/news\/wp-json\/wp\/v2\/posts\/3899","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/guialimeira.com.br\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/guialimeira.com.br\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/guialimeira.com.br\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/guialimeira.com.br\/news\/wp-json\/wp\/v2\/comments?post=3899"}],"version-history":[{"count":0,"href":"https:\/\/guialimeira.com.br\/news\/wp-json\/wp\/v2\/posts\/3899\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/guialimeira.com.br\/news\/wp-json\/wp\/v2\/media\/2039"}],"wp:attachment":[{"href":"https:\/\/guialimeira.com.br\/news\/wp-json\/wp\/v2\/media?parent=3899"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/guialimeira.com.br\/news\/wp-json\/wp\/v2\/categories?post=3899"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/guialimeira.com.br\/news\/wp-json\/wp\/v2\/tags?post=3899"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}